Study engineering drawings and correspondence with the employer for possible errors and problems in project implementation and preliminary estimates of materials required...
Second Stage:
Check all the construction is done under the supervision of factory quality control. Location downloaded and sent to the project...
Third Stage:
Evacuated and sent to separate parts of the plant, installation columns, beams installed their original promise and delivery of sub-beams, columns and
set the stage to stage...